Heating plant in Košice - TEKO a.s.

Heating plant in Košice - TEKO a.s.

The first installation of the HI-FOG system was realized already in 2009. During this stage conveyor belts and overflow tower were secured againts fire. For this installation, MSPU 8 pump unit and 106 sprinkler heads were used. In 2011, Stage 2...

5 fotografií, Detail reference

The first installation of the HI-FOG system was realized already in 2009. During this stage conveyor belts and overflow tower were secured againts fire. For this installation, MSPU 8 pump unit and 106 sprinkler heads were used. In 2011, Stage 2 followed, in which internal conveyor belts were secured and in the 3rd stage, which took place in 2017, we also participated in fire protection of tanks for eventual oil leakage from turbo-generators TG1 and TG2.

Hotel Sheraton - Praha

Hotel Sheraton - Praha

The KLIKA company did not participate at first stage of installation of HI-FOG fire protection system at Sheraton hotel in 2008. However, during the second stage in 2017, we extended protection against the fire to the terrace bar. So now in Sheraton...

1 fotografie, Detail reference

The KLIKA company did not participate at first stage of installation of HI-FOG fire protection system at Sheraton hotel in 2008. However, during the second stage in 2017, we extended protection against the fire to the terrace bar. So now in Sheraton Hotel are protected not just rooms but also hotel facilities.

Klementinum - National Library of the Czech Republic

Klementinum - National Library of the Czech Republic

The National Library of the Czech Republicis an iconic and well-loved institution in the city of Prague. Built over 400 years ago, the library holds more than six million visitors every year and serves the needs of more than  million visitors...

3 fotografie, Detail reference

The National Library of the Czech Republicis an iconic and well-loved institution in the city of Prague. Built over 400 years ago, the library holds more than six million visitors every year and serves the needs of more than  million visitors every year. Due to the history of  the building and its irreplaceable historic books, the refurbishment  that occurred in 2011 ha do be meticulously and sensitively planned. To safeguard the library,x delicate interior and irreplaceable book collections reliable fire protection was required. The HI-FOG® GPU unit was the perfect fit for the customer due to its low use of waster, very narrow tubing and inconspicuous installation. Furthermore, it had to cause minimal damage to the valuable books and interior in case of a fire. The four floors of the library are now protected with the systém that was chosen after consulting several historical building refurbishment projects. After installation a number of other HI-FOG® benefits were discovered. There is no need for and electric supply to keep the GPU unit running, it only requires minimal storage space and i tis able to work alongside with the other systems already in place. Enhanced protection for one of the most valuable cultural heritages of the Czech Republic was instaled.

Institute of Organic Chemistry and Biochemistry AS CR v.v.i.

Institute of Organic Chemistry and Biochemistry AS CR v.v.i.

Another example of the installation of the HI-FOG system is the Institute of Organic Chemistry and Biochemistry in Prague. The premises of the Institute are administrative buildings and underground garages. The total clean area is almost 33,000...

4 fotografie, Detail reference

Another example of the installation of the HI-FOG system is the Institute of Organic Chemistry and Biochemistry in Prague. The premises of the Institute are administrative buildings and underground garages. The total clean area is almost 33,000 square meters. For this range, a total of 2,100 nozzles were used.

Reconstruction began in the 2009 by design phase and was also divided into 3 stages.

ArcelorMittal - fire protection of conveyors

ArcelorMittal - fire protection of conveyors

ArcelorMittal is the largest steel producer in the Czech Republic. The production activities of the company are mainly focused on the production and processing of pig iron and steel and metallurgical cooperatives. ArcelorMittal Ostrava a.s. belongs...

7 fotografií, Detail reference

ArcelorMittal is the largest steel producer in the Czech Republic. The production activities of the company are mainly focused on the production and processing of pig iron and steel and metallurgical cooperatives. ArcelorMittal Ostrava a.s. belongs to the world's largest steel and mining group ArcelorMittal.

The annual production capacity is 3 million tons of steel. In addition to home markets, the company has sold its products to more than 40 countries. ArcelorMittal has decided to invest in ensuring safety and fire protection and preventing the possibility of large damage caused by a possible fire, which may occur for several reasons.

They have chosen protection by the HI-FOG high-pressure water mist system.

- a total of 15 conveyor belts, the longest of which is 90 meters

- A total of 183 nozzles are used

- 15 section valves

Shopping center Zlín - Kvítkova

Shopping center Zlín - Kvítkova

In the first phase, which was realized in 2009, all the business units and facilities of the Zlín shopping center, including the Fitcentra Wellness Center, were provided with the HI-FOG system. In 2017, the next stage took place, during which...

2 fotografie, Detail reference

In the first phase, which was realized in 2009, all the business units and facilities of the Zlín shopping center, including the Fitcentra Wellness Center, were provided with the HI-FOG system. In 2017, the next stage took place, during which there was a change within the 3 and 4 floors, which were rebuilt into administrative areas and adequately modified and protected againts fire. In the event of a fire, the EPS panel opens a central valve in the engine room and the valve of that section - run the head in the section that triggered the fire defence and the next section in the bandwidth to spread the fire.

Logistic hall DC6 Jirny

Logistic hall DC6 Jirny

In 2017, we worked on several interesting projects. One of them is the DC6 logistics hall in Jirny. Here we have taken care of ensuring corporate security with a sprinkler system. In total, 1776 heads were used.

4 fotografie, Detail reference

In 2017, we worked on several interesting projects. One of them is the DC6 logistics hall in Jirny. Here we have taken care of ensuring corporate security with a sprinkler system. In total, 1776 heads were used.

Towercom Kamzík - Bratislava

Towercom Kamzík - Bratislava

Data Center - 183 square meters - Inergen.

1 fotografie, Detail reference

Data Center - 183 square meters - Inergen.

Honeywell - Olomouc

Honeywell - Olomouc

There are 4 rooms in Honeywell which are protected against fire - Servers and Archives - Extinguishing agent Novec 1230. The total area - 70 square meters.

1 fotografie, Detail reference

There are 4 rooms in Honeywell which are protected against fire - Servers and Archives - Extinguishing agent Novec 1230. The total area - 70 square meters.

KIA Motors - Žilina

KIA Motors - Žilina

As part of the expansion of the KIA MOTORS site in Žilina, KLIKA-BP a.s.technologies  has been installed in the server and UPS rooms, specifically the fixed fire extinguishing system with the FM200 extinguishing agent. The total protected area...

2 fotografie, Detail reference

As part of the expansion of the KIA MOTORS site in Žilina, KLIKA-BP a.s.technologies  has been installed in the server and UPS rooms, specifically the fixed fire extinguishing system with the FM200 extinguishing agent. The total protected area is 130 square meters.

Danone - Benešov

Danone - Benešov

In the Benešov company DANONE we installed a gas stationary fire extinguisher with a fire extinguisher FM 200. Fire protection technologies are installed in rooms with server and distribution.

2 fotografie, Detail reference

In the Benešov company DANONE we installed a gas stationary fire extinguisher with a fire extinguisher FM 200. Fire protection technologies are installed in rooms with server and distribution.

Depositary - National Technical Museum - Čelákovice

Depositary - National Technical Museum - Čelákovice

Installed fixed gas fire extinguishing system in archives - 11 rooms - Inergen - total protected area of 2350 square meters.

3 fotografie, Detail reference

Installed fixed gas fire extinguishing system in archives - 11 rooms - Inergen - total protected area of 2350 square meters.

Hospital in Jihlava - a backup data center of the Vysočina Region

Hospital in Jihlava - a backup data center of the Vysočina Region

Gas fixed fire extinguishing system installed in two rooms with servers. Extinguishing agent – FM200.

1 fotografie, Detail reference

Gas fixed fire extinguishing system installed in two rooms with servers. Extinguishing agent – FM200.

ALRO Trnava - Painting box

ALRO Trnava - Painting box

For the company ALRO Trnava, part of the ALRO Group, we have been involved in fire protection of th the painting booth. In 2016, the HI-FOG system was overhauled - MAUs and two sprinkler heads.

1 fotografie, Detail reference

For the company ALRO Trnava, part of the ALRO Group, we have been involved in fire protection of th the painting booth. In 2016, the HI-FOG system was overhauled - MAUs and two sprinkler heads.

Stora Enso Žďírec

Stora Enso Žďírec

At Stora Enso Ždírec, two rooms are protected by gas fixed fire extinguishing system- control room and the substation - with a total area of 120 square meters.

1 fotografie, Detail reference

At Stora Enso Ždírec, two rooms are protected by gas fixed fire extinguishing system- control room and the substation - with a total area of 120 square meters.

IKEA Malacky

IKEA Malacky

Our company operates not only in the Czech Republic, but also projects in Slovakia. One of them was the installation of our sprinkler systems as part of IKEA warehouse extension at Malacky.

1 fotografie, Detail reference

Our company operates not only in the Czech Republic, but also projects in Slovakia. One of them was the installation of our sprinkler systems as part of IKEA warehouse extension at Malacky.